We use cookies. Find out more about it here. By continuing to browse this site you are agreeing to our use of cookies.
#alert
Back to search results

Project Scheduler

Allan Myers
United States, Virginia, Fairfax
12500 Fair Lakes Circle (Show on map)
Aug 22, 2025

Project Scheduler
Job Locations

US-VA-Fairfax



ID
2025-13413

# of Openings
1

Category
Logistics



Responsibilities

Allan Myers Core Values

    Communicates, models and continuously reinforces Allan Myers Culture and leadership practices with other team members, including Allan Myers Values, Safety, Ethics Policy, and the Collaborative Way.

Technical: Means/Methods:

  • Prepares monthly updates to CPM schedule and prepares associated schedule narrative for submission to the project Client in accordance with contract documents.
  • Gathers as-built schedule data from project team on a weekly basis and provides updated look ahead schedules to project team.
  • Prepares schedule impact analyses to support change orders or other requests for contract time extensions
  • Analyzes project problems and recommends corrective action that has the least impact to cost and schedule.
  • Utilizes project management systems to track adherence to contract requirements, including but not limited to submittal tracking, communication documentation, requests for information, plan revisions, and notice requirements.

Safety:

  • Supports and enforces the Allan Myers Safety Program including the coordination of project activities to ensure compliance with all government regulatory guidelines and agencies


Qualifications

  • High Level understanding of Primavera P6 scheduling software
  • Ability to Schedule Heavy Civil, Highway Infrastructure Projects, utilizing Primavera P6 Software
  • B.S. in Civil Engineering, Construction Management, related major, or equivalent. Continuing education in construction and project controls is highly desirable
  • Minimum of 2 years of construction management experience in estimating, operations and/or engineering required
  • AACE International Planning & Scheduling Professional certification desirable
  • Valid driver's license required
Competencies:

Technical: change order management, computer systems, contract administration systems, job cost management, labor and equipment reporting, planning and scheduling, preconstruction planning, safety policies and procedures, safe work procedures

Business: relationship management

Leadership/Management: accountability, change management, coaching/mentoring, corporate policies, decision-making, leadership, progress reporting, training/teaching

Personal Attributes/Skills: analytical, business ethics/integrity, conflict resolution, detail oriented, diversity, influence/persuasion, listening skills, negotiations, oral communications, presentations, problem solving, time management, written communications

Physical Demands:

Frequently requires the ability to sit, talk, use hands/fingers and hear. Occasionally requires the ability to stand, walk, reach, climb or balance, stoop, kneel or crouch. Occasionally requires the ability to lift up to 25 lbs. Requires following specific types of vision: close, distance, peripheral, depth perception and ability to adjust focus.

Work Environment:

Exposure to the following environmental conditions: moving mechanical parts, high, precarious places, fumes or airborne particles, outside weather conditions and vibration. Typical work environment is moderate noise level.

Allan Myers is an equal opportunity employer, committed to a diverse workforce (Minority/Female/Protected Veterans/Disabled).



Overview

Our Company Does Work That Matters

Allan Myers is the largest heavy civil construction and materials production contractor in the mid-Atlantic. We build infrastructure: the highways and bridges that connect cities and towns, the public water and wastewater systems that provide clean water to your home and keep our streams clean. We take pride in meeting the highest quality standards because it ensures our work will have a long-lasting positive impact on the community. When you get home safe each night, you know that what you did that day matters.

At Allan Myers, you are part of a team dedicated to making things better, including your career. We pay well and provide generous benefits. We offer extensive training and promote from within. If you have the drive, we will help you build a career in the thriving construction industry and reach your full potential.

Allan Myers is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national or ethnic origin, age, disability, protected veteran status or other characteristics protected by law.

Applied = 0

(web-5cf844c5d-sn4fz)